9.1.1 Mining and metallurgical property, plant and equipment– major fixed assets under construction
in PLN millions, unless otherwise stated
|
As at 31 December 2021 |
As at 31 December 2020 |
Deposit Access Program | 2 796 | 2 420 |
Construction of the SW-4 shaft | 565 | 589 |
Investment activity related to the development and operation of the Żelazny Most Tailings Storage Facility | 424 | 1 133 |
Damówka pumping station with a backwater pipeline in the Tailings Division | 131 | 103 |
BAT As – Installation for arsenic and mercury removal from gases before Solinox installation | 113 | 52 |
Modernisation of the tankhouse at Głogów I Copper Smelter and Refinery – reconstruction of the roof and walls of the tankhouse | 89 | 54 |
Optimisation of the Flash Furnace technology in the Głogów I Copper Smelter and Refinery, STAGE 2 | 12 | 65 |
Modernisation of a recovery boiler cleaning system at the Głogów I Copper Smelter and Refinery | – | 58 |