9.1.1 Mining and metallurgical property, plant and equipment– major fixed assets under construction

mask

in PLN millions, unless otherwise stated

 

 

As at
31 December 2021
As at
31 December 2020
Deposit Access Program 2 796 2 420
Construction of the SW-4 shaft 565 589
Investment activity related to the development and operation of the Żelazny Most Tailings Storage Facility 424 1 133
Damówka pumping station with a backwater pipeline in the Tailings Division 131 103
BAT As – Installation for arsenic and mercury removal from gases before Solinox installation 113 52
Modernisation of the tankhouse at Głogów I Copper Smelter and Refinery – reconstruction of the roof and walls of the tankhouse 89 54
Optimisation of the Flash Furnace technology in the Głogów I Copper Smelter and Refinery, STAGE 2 12 65
Modernisation of a recovery boiler cleaning system at the Głogów I Copper Smelter and Refinery 58